Page 48 - CBM26
P. 48

~ Ranpak ~





            A further challenge came from the fact that the carrier   Seeing the benefits
            (DHL) has recently imposed the use of a minimum 1 cm-  Ranpak’s automated solution has allowed CEWE to reduce
            high box for flat products, which are much easier to handle   the number of interim workers hired during peak periods,
            on their conveyors.                               resulting in better handling of high demand and enhanced
                                                              production flexibility.
            Solving the problem
            Automating the packing process proved to be a highly   Both throughput and quality were improved. Before CEWE
            attractive solution. Ranpak installed 5 Flap’it!™ machines,   started to automate, each package had to be processed
            each able to pack up to 540 orders per hour, at two of   manually. Now, 30% of the total packing operation is
            CEWE’s sites, Oldenburg and Germering. These reliable   automated thanks to Ranpak’s Flap’it! solution. As a result,
            automated machines, connected with label printers, speeding   delivery time to the end customer is faster, labour costs
            up the packing process of flat products in 1 cm boxes. The   are reduced and shipping costs are lower thanks to smaller
            resulting system is a highly effective solution that automates   packages. CEWE’s line performance and packaging quality
            the packing of small products such as (photo)books, graphical   are now exceptionally high. With integrated cushioning
            art, picture and cards, phone covers and other flat products.   bumpers in the corners of the parcels, the products are
                                                              also highly protected during shipping without the need for
            Despite really tight planning, Ranpak was able to install and   additional void fill material. ••
            train the CEWE teams efficiently before the start of the peak
            season, thanks to close collaboration between Ranpak and
            CEWE.
              “WE REALLY APPRECIATED THE COMMITMENT AND EFFICIENCY OF THE RANPAK TEAM

                TO INSTALL THE AUTOMATED MACHINES WHILE THE PRODUCTION WAS RUNNING.”

                                             IMKE VAHLENKAMP - TECHNICAL PROJECT MANAGER





















































                                                            48
   43   44   45   46   47   48   49   50   51   52   53